国产饥渴孕妇在线播放,君占臣妻h占臣妻h,在线观看黄A片免费网站,厨房里摸着乳丰满大屁股

Rail type multifunctional power instrumentThree phase multifunctional power instrument (rail type)
BACK
Product overview

metering

Measure positive/negative active energy and have automatic identification and indication of power direction.

The total, peak, peak, flat, and valley electrical energy are stored separately and stored in corresponding storage units.

The electricity meter can store data for 3 months, and the default date for freezing and transferring electricity is 24:00 at the end of the month (frozen at the end of the month).

After a power outage, all stored data is not lost and can be maintained for more than 10 years.

output

Active electrical energy pulse output, used for meter calibration and energy collection.

Clock and time slot rates

Internal hardware clock, clock error within 0.5s/day.

Programmable settings for peak, peak, flat, and valley rates, with 8 daily intervals and a minimum interval of 1 hour.

programming

Programming settings are carried out through the upper computer.

Time and date settings.

Setting the address of the electricity meter.

Rate period settings.

Setting the battery level to zero.

display

7-bit wide temperature LCD display.

Real time data rotation display, with a cyclic display time of 4 seconds.

The electrical energy pulse is indicated by a red LED.

Four types of tariff periods are indicated in Chinese characters: sharp, peak, flat, and valley.


Technical parameter

Appearance and hole size

Installation diagram

The three-phase multifunctional power instrument adopts a 35mm standard guide rail installation method, as shown in the following figure:

Wiring method

This series of three-phase multifunctional power instruments supports two connection methods: direct connection and CT connection through current transformers.

Note: Please refer to the actual wiring diagram of the instrument during actual wiring, where variable 6 in the wiring diagram of 4P-1 represents the selectivity of reactive and clock pulses.

(default to pulse output)


Typical application diagram

CNIK300-E/FC is a three-phase multi rate active energy metering meter.

CNIK300-E/FC has a pulse output that can collect the consumption of active electrical energy and achieve DCS remote transmission.

CNIK300-E/FC has RS485 communication function, which can achieve meter reading and programming settings through the upper computer.

Ordering Example

Example 1:

Model: CNIK100-E/FC;

Application: single-phase system;

Participating voltage: AC 220V;

Current specification: 5 (20) A;

Measurement parameters: current, voltage, time sharing and complex rate electricity;

Additional function: with RS485 communication;

Other: Factory pre-set for time-sharing time slots (default settings will be used if not specified).

Example 2:

Model: CNIK300-E/FC;

Application: three-phase four wire system;

Participating voltage: AC 3 × 220V;

Current specification: 10 (40) A;

Measurement parameters: time sharing and multi rate electricity;

Additional function: with RS485 communication;

Other: Factory pre-set for time-sharing time slots (default settings will be used if not specified).


Sample download
亚洲AV无码一区二区二三区| 国产亚洲日韩精品激情| 精品无码国产自产在线观看| 国产精品久久久久久久久爆乳| 日本大片在线看黄a∨免费| 国产在线拍揄自揄视频菠萝| 国产老狼一卡2卡3卡4卡隐藏版| 国产三级在线观看免费| 国产精品嫩草久久久久| 国产三级在线观看免费| 国产偷窥女洗浴在线观看一区|